New City School

Client: Neilcott Construction
Specialist Installer: A.J Hills Limited
Project details: Infill System
Steel Frame Solutions, were able to provide a fast track solution for a new facility at New City school in East London. We were brought in to the project at a late stage to assist with fast track options and help regain construction time tables. From the initial enquiry, we were on site within 24 hours and able to deliver LWSF sections within a week, from our stock range in Kent. We put together an infill system Specification pack, working with the existing project team and specialist installers to move the scheme forward in line with the anticipated construction programme.

New City School

Head Office

 

Unit 20, Riverside 1,

Sir Thomas Longley Road,

Medway City Estate, Rochester,

Kent ME2 4DP

Telephone: 01622 719430

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Website: www.steelframesolutions.co.uk

 

Steel Frame Solutions is a trading name for Eco Design & Build Solutions Ltd.

Company Registered No: 06006565

Facebook

Follow Us

 

LinkedIn 

 

Facebook logo

© Steel Frame Solutions 2015
Powered by Joomla 1.7 Templates