Design timetables are typically guide lined as 6-8 weeks to issue for comment/approval. It should be noted that design periods may extend beyond this on some projects.

NB: SFS Design process is initiated following receipt of a design order.

Design Process

Head Office


Unit 20, Riverside 1,

Sir Thomas Longley Road,

Medway City Estate, Rochester,

Kent ME2 4DP

Telephone: 01622 719430

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.



Steel Frame Solutions is a trading name for Eco Design & Build Solutions Ltd.

Company Registered No: 06006565


Follow Us




Facebook logo

© Steel Frame Solutions 2015
Powered by Joomla 1.7 Templates