Design timetables are typically guide lined as 6-8 weeks to issue for comment/approval. It should be noted that design periods may extend beyond this on some projects.

NB: SFS Design process is initiated following receipt of a design order.

Design Process

Head Office

 

Unit 20, Riverside 1,

Sir Thomas Longley Road,

Medway City Estate, Rochester,

Kent ME2 4DP

Telephone: 01622 719430

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Website: www.steelframesolutions.co.uk

 

Steel Frame Solutions is a trading name for Eco Design & Build Solutions Ltd.

Company Registered No: 06006565

Facebook

Follow Us

 

LinkedIn 

 

Facebook logo

© Steel Frame Solutions 2015
Powered by Joomla 1.7 Templates